The short answer
For a typical single-phase home, two Perth electricians publish fixed or starting prices of $1,300 to $1,795 including GST, and a third lists its standard upgrade at $2,290 + GST. A larger home or a three-phase board starts from about $2,400. The things that move the price most are old ceramic fuses, an asbestos meter panel, how many circuits need safety switches, and whether Western Power has to disconnect or change your supply.
Switchboard upgrade and replacement costs in WA
No Busselton or South West electrician we checked publishes switchboard prices, so these are the fixed and starting prices three Perth electricians publish. Treat them as a guide to what's normal, not a quote.
Published switchboard prices
| What's charged | Published price | Who publishes it |
|---|---|---|
| Switchboard upgrade, fixed price (small / medium / large) | $1,300 / $1,500 / $1,700 incl. GST | Westside Electrical, Perth |
| Basic switchboard upgrade | From $1,495 incl. GST | AVL Electrical, Perth |
| Replacing an old ceramic fuse board | From $1,795 incl. GST | AVL Electrical, Perth |
| Larger home or three-phase board | From $2,400 incl. GST | AVL Electrical, Perth |
| Standard upgrade | $2,290 + GST ($2,519), to be checked with the client | Martin & Co Electrical, Perth |
| Adding or replacing one RCD safety switch | $200 fixed, or from $220, incl. GST | Westside Electrical; AVL Electrical |
Prices as published by three Perth electricians, checked 27 September 2026. Westside's are fixed and include the service call, parts, labour and GST; AVL's are starting prices confirmed after a look at the site; Martin & Co's excludes GST. Busselton jobs can differ with travel and site conditions.
The spread is mostly about scope. A small board with a handful of circuits and a sound meter box sits at the bottom. A bigger house, more circuits, a new enclosure or a three-phase supply sits at the top.
What pushes the price up
Old ceramic fuses
Western Power's installation rules say that when a switchboard or supply arrangement is upgraded, any old rewireable fuses on that board must be replaced. One Perth electrician prices a ceramic fuse board replacement from $1,795.
An asbestos meter panel
Until July 1988, WA meter panels could be made from asbestos-containing board sold as Miscolite, Zelemite or Lebah. They're usually black, 12 to 30 mm thick, with the brand sometimes stencilled on the back. Western Power says the asbestos stays passive until the panel is cut, drilled or damaged, and that when a panel is upgraded or removed, the asbestos must go, with none left near the meter.
Removing it has to follow WorkSafe WA's asbestos procedures, and whether a licensed removalist is needed depends on the panel's condition and size. None of the price lists we checked publishes a dollar figure for this, so ask for it as its own line on the quote.
- Don't drill, cut, sand or scrape an old black meter panel yourself
- If your home was built before the late 1980s, mention the panel when you ask for quotes
How many circuits need safety switches
Under WA's rules for homes being sold or rented, RCDs must cover every power point and lighting circuit, each RCD can protect no more than three circuits, and you need at least two. A house with eight power and lighting circuits therefore needs at least three RCDs, or an RCBO on each circuit. More circuits means more safety switches. Two Perth electricians publish $200 (fixed) and from $220 to fit or replace a single RCD.
The meter box itself
The meter belongs to Western Power, but the meter panel and enclosure are the owner's responsibility. If yours is too small, damaged or built on a timber frame, it may need replacing to meet current requirements, which adds materials and time.
Western Power fees
Some upgrades need the supply switched off at the street. Changing to three-phase or increasing your supply always involves Western Power. Your electrical contractor lodges the request, and these are Western Power's own published fees:
Western Power's published fees
| Network work | Published price | Who publishes it |
|---|---|---|
| Temporary disconnection and reconnection at the street | $659 business hours, $689 after hours | Western Power, 5–7 weeks' notice |
| Changing from single-phase to three-phase | $586 – $853 | Western Power, where three-phase is available |
| Increasing the supply to the house | $506 application, then a design fee from $1,353 | Western Power; construction quoted separately; most take 3–13 months |
Western Power's published fees, checked 27 September 2026. The disconnection and phase-change pages don't say whether GST is included, and a phase change also has a design fee charged when it's lodged. Your electrical contractor lodges the request. Not every upgrade needs one, so ask whether it's needed and whether it's in the quote.
The lead times matter as much as the fees: 5 to 7 weeks for a disconnection or phase change after the request is accepted, and Western Power says most supply increases take 3 to 13 months. If you're upgrading before a sale or a new tenancy, start early.
Faults found along the way
New safety switches sometimes trip on circuits that were quietly faulty all along, such as a damaged cable or a wet outdoor power point. They're doing their job. Ask how the electrician will price any repairs they find before they start.
When WA law requires safety switches
An owner must have RCD safety switches properly installed before a home's title is transferred, before a new residential tenancy starts, and before it's offered as short-term rental accommodation or for hire. "Properly installed" means:
- RCDs covering every power point and lighting circuit
- At least two RCDs if the home has more than one circuit
- Each RCD protecting no more than three circuits
- Lighting circuits split between the RCDs, so one trip doesn't leave the house dark
- Rated at no more than 30 mA and installed at the switchboard
The penalty is up to $15,000 for an individual and $100,000 for a company. If a seller doesn't comply, the buyer has to install them within two months of settlement and can recover the reasonable cost from the seller. Homes built after 1 January 2019 need RCDs on every circuit under the current wiring rules. See smoke alarms and RCDs for the smoke alarm rules that apply at the same time.
Comparing quotes
Two quotes can look similar and include very different things. Ask each electrician:
- Is every power and lighting circuit protected by an RCD or RCBO, or only some?
- Is the meter panel or enclosure being replaced, and is any asbestos removal priced separately?
- Does the job need a Western Power disconnection or supply change, and is that fee in the price?
- Is surge protection included?
- How will repairs to faults found during the job be priced and approved?
- What's their EC licence number? You can check it with Building and Energy.
WA Consumer Protection's advice is to get at least three written quotes and check whether GST is included, and it says a deposit is generally no more than 10 per cent. See call-out fees and hourly rates for what a written quote should show.
The paperwork you should get
In WA, the electrical contractor must give you an Electrical Safety Certificate within 28 days of finishing installation work like a switchboard upgrade. For notifiable work they also lodge a preliminary notice with Western Power before starting and a notice of completion within 3 working days of finishing. Keep the certificate with your property records.
Common questions
How much does a switchboard upgrade cost in WA?
Two Perth electricians publish fixed or starting prices of $1,300 to $1,795 including GST for a typical single-phase home, and a third lists its standard upgrade at $2,290 + GST. Larger homes and three-phase boards start from about $2,400 (checked 27 September 2026). Western Power fees, an asbestos meter panel or extra circuits can add to that, and Busselton prices can differ with travel.
How much does it cost to replace a ceramic fuse box?
A Perth electrician publishes ceramic fuse board replacement from $1,795 including GST. Western Power's rules say that when a switchboard or supply is upgraded, any old rewireable fuses on that board must be replaced.
How much does it cost to add a safety switch?
Two Perth electricians publish $200 (fixed) and from $220, including GST, to fit or replace a single RCD safety switch. If the board has no room, or still has ceramic fuses, a full upgrade may be the better option.
Is the Western Power fee included in a switchboard quote?
Not always, so ask. Some upgrades need the supply disconnected at the street ($659 in business hours), and a change to three-phase costs $586 to $853 plus a design fee. Your electrical contractor lodges the request. Disconnections and phase changes take 5 to 7 weeks; Western Power says most supply increases take 3 to 13 months.
Is an asbestos meter board dangerous?
Western Power says the asbestos in old meter panels stays passive until the panel is cut, drilled or damaged. Don't drill, cut or scrape it yourself. When the panel is replaced during an upgrade, the asbestos has to be removed under WorkSafe WA's safety procedures, so ask for that as its own line on the quote.
Is there a charge to get a quote?
Sometimes. WA Consumer Protection notes that some quotes attract a fee, so check before you book one. At least one Dunsborough–Busselton electrician doesn't charge to come out and quote in its core area.
Where these figures come from
The prices and rules on this page come from these published pages, checked on 27 September 2026.
- Westside Electrical · Perth electrician, fixed switchboard prices
- Shockwave Electrical: Busselton · Dunsborough–Busselton electrician, published call-out policy for quotes
- AVL Electrical · Perth electrician, published switchboard price guide
- Martin & Co Electrical · Perth electrician, published standard upgrade price
- Western Power: temporary disconnection · Network operator fees and lead times
- Western Power: phase conversion · Network operator fees and lead times
- Western Power: increase residential supply · Network operator application and design fees
- Western Power: what we do · The network operator for the South West Interconnected System, Kalbarri to Albany and Kalgoorlie, which takes in Busselton
- Western Australian Service and Installation Requirements (2023) · Network rules for meter panels, asbestos panels and rewireable fuses
- Building and Energy: RCD safety switches · WA Government guide to the sale, rental and hire rules
- Electricity Regulations 1947, Part IV · WA law setting the RCD requirements (regs 12A–18)
- Building and Energy: having electrical work done · WA Government guide to licences and Electrical Safety Certificates
- Building and Energy: electrical eNotice guide · WA Government guide to preliminary and completion notices
- WorkSafe WA: asbestos law and guidance · WA work health and safety regulator
- Consumer Protection WA: estimates, quotes and deposits · WA Government consumer guidance, updated 4 September 2026